Around this site

← Back to Xinjiang

Solar · China

Xinjiang Kashgar Bachu Huaguang Grid-Connected solar farm

Operational60 MWChecked 8 October 2026Last changed in the dataset 1 March 2022

Technology
Solar
Capacity
60 MW
Status
Operational (Operating)
Operator
Bachu Huaguang Power Generation
Owner
Jiangsu Trina Solar Power Development Co Ltd [100%]
Location
Photovoltaic Industrial Park, Kashgar Prefecture, Xinjiang, China
First operating
2015
Phases in the tracker
2

View on OpenStreetMap (the tracker marks the position as approximate). The larger dot is this site; the others are sites within 40 km.

None found. The register holds no published incident that names Xinjiang Kashgar Bachu Huaguang Grid-Connected solar farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts.