Xinjiang Hami - Chongqing Transmission Line solar farms

Operational3200 MWChecked 8 October 2026Last changed in the dataset 21 October 2025

Technology
Solar
Capacity
3200 MW
Status
Operational (Operating)
Operator
Xinjiang Chongqing Energy Power Development
Owner
Xinjiang Huadian Tianshan Power Generation Co Ltd
Location
Naomaohu, Hami, Xinjiang, China
First operating
2025
Phases in the tracker
5

View on OpenStreetMap (the tracker marks the position as approximate). The larger dot is this site; the others are sites within 40 km.

None found. The register holds no published incident that names Xinjiang Hami - Chongqing Transmission Line solar farms. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts.