Around this site

← Back to Xinjiang

Solar · China

Xinjiang 13th Division Hongxing Farm (Huiju) solar farm

Operational30 MWChecked 8 October 2026Last changed in the dataset 6 April 2023

Technology
Solar
Capacity
30 MW
Status
Operational (Operating)
Operator
Hami Huijucheng Solar Energy
Location
Hami, Xinjiang, China
First operating
2016

View on OpenStreetMap (the tracker marks the position as approximate). The larger dot is this site; the others are sites within 40 km.

None found. The register holds no published incident that names Xinjiang 13th Division Hongxing Farm (Huiju) solar farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts.