Planning pack for this site, £295Other options

Onshore wind · Germany

Wulfelade IV

Operator ecoJoule construct GmbH

Planned8.5 MWData checked 10 November 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Wulfelade IV is a 8.5 MW wind farm 8.8 km north of Neustadt am Rübenberge, Germany. It first operated in 2029. Its status in the Marktstammdatenregister (Bundesnetzagentur, Germany) is planned. There are 38 other energy sites within 10 km, 37 of them wind farms. The register holds no incident at this site. It holds 30 incidents at wind farms in Germany, and 351 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Wulfelade IV sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 24 comparable onshore wind incidents in Germany, nearest first. The nearest is EIR-1352, Turbine fire at Stemwede Bürgerwindpark in Germany, 72 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-13522023Turbine fire at Stemwede Bürgerwindpark in Germany72 kmSignificant
EIR-08082018Nacelle fire at Rhede wind farm prompts Enercon investigation158 kmSignificant
EIR-07402025Nordex turbine collapses at Herkentrup wind farm in Germany173 kmMajor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 21 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Onshore wind
Capacity
8.5 MW
Capacity figure from
Marktstammdatenregister (Bundesnetzagentur, Germany)
Status
Planned (In planning)
Operator
ecoJoule construct GmbH
Location
Neustadt am Rübenberge, Region Hannover, Niedersachsen, 31535, Germany
First operating
2029
Turbines
2

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names Wulfelade IV. If you know of one, report it (confidential reports are anonymised).

Has Wulfelade IV had a fire or other incident?
None is on the register as of 11 November 2026. The register holds no published incident that names Wulfelade IV; it holds 30 incidents at wind farms in Germany.
What is the status of Wulfelade IV?
Planned, in the Marktstammdatenregister (Bundesnetzagentur, Germany).
Where is Wulfelade IV?
8.8 km north of Neustadt am Rübenberge, Germany (postcode 31535).

Source: Marktstammdatenregister, Bundesnetzagentur, Datenlizenz Deutschland, Namensnennung, Version 2.0 (www.govdata.de/dl-de/by-2-0). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).