Onshore wind · Germany
WP Bärenholz
Operator Primus Dritte Projekt GmbH & Co. KG
Planned24 MWData checked 10 November 2026
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
WP Bärenholz is a 24 MW wind farm 3.9 km east of Schwarzenbach an der Saale, Schwarzenbach a.d. Saale, Hof, Bayern, Germany. It first operated in 2028. Its status in the Marktstammdatenregister (Bundesnetzagentur, Germany) is planned. There are 31 other energy sites within 10 km, 9 of them wind farms. The register holds no incident at this site. It holds 30 incidents at wind farms in Germany, and 350 worldwide.
Get an email when WP Bärenholz changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in Germany. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for WP Bärenholz sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 24 comparable onshore wind incidents in Germany, nearest first. The nearest is EIR-0346, Two workers die after work basket fall at Birstein wind turbine, Germany, 192 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-0346 | 2026 | Two workers die after work basket fall at Birstein wind turbine, Germany | 192 km | Major |
| EIR-2236 | 2026 | Rotor blade falls from turbine at Waldhausen wind farm, Germany | 202 km | Significant |
| EIR-2405 | 2026 | Wind turbine blade falls after trailer overturns near Plettenberg | 310 km | Minor |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 21 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Onshore wind
- Capacity
- 24 MW
- Capacity figure from
- Marktstammdatenregister (Bundesnetzagentur, Germany)
- Status
- Planned (In planning)
- Operator
- Primus Dritte Projekt GmbH & Co. KG
- Location
- Schwarzenbach a.d. Saale, Hof, Bayern, 95126, Germany
- First operating
- 2028
- Turbines
- 4
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
Incidents on the register at this site
None found. The register holds no published incident that names WP Bärenholz. If you know of one, report it (confidential reports are anonymised).
Questions
- Has WP Bärenholz had a fire or other incident?
- None is on the register as of 10 November 2026. The register holds no published incident that names WP Bärenholz; it holds 30 incidents at wind farms in Germany.
- What is the status of WP Bärenholz?
- Planned, in the Marktstammdatenregister (Bundesnetzagentur, Germany).
- Where is WP Bärenholz?
- 3.9 km east of Schwarzenbach an der Saale, Schwarzenbach a.d. Saale, Hof, Bayern, Germany (postcode 95126).
Source: Marktstammdatenregister, Bundesnetzagentur, Datenlizenz Deutschland, Namensnennung, Version 2.0 (www.govdata.de/dl-de/by-2-0). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).