Wormit Solar Farm

Operator Green Hedge (BayWa r.e.)

Operational4 MWData checked 16 November 2026Source record dated 27 February 2017

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Wormit Solar Farm is a 4 MW solar farm 6 km south of Dundee, Fife, United Kingdom. Its planning application (15/02521/FULL) went to Fife on 20 July 2015 and was granted on 9 October 2015. It has been operating since 31 March 2017. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 25 other energy sites within 10 km, 12 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 4 other sites and 274 energy sites within 40 km for Wormit Solar Farm

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
4 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Green Hedge (BayWa r.e.)
Location
Land North East of Kilmany Road, Wormit, Newport-On-Tay, Fife, DD6 8P, United Kingdom
Planning authority
Fife
Planning application
15/02521/FULL
First operating
2017

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 15/02521/FULL, with what the planning evidence pack adds for this site.

Every application in Fife · Alerts for applications and incidents near here

  • 20 July 2015 Planning application submitted
  • 9 October 2015 Planning permission granted
  • 15 January 2016 Construction started
  • 31 March 2017 Operational

None found. The register holds no published incident that names Wormit Solar Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Wormit Solar Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Wormit Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Wormit Solar Farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 27 February 2017.
Where is Wormit Solar Farm?
6 km south of Dundee, Fife, United Kingdom (postcode DD6 8P).