← Back to Tayside
Planning pack for this site, £295Other options

Solar · United Kingdom

Stannergate Wastewater Pumping Station - Solar Farm

Operator Scottish Water (Dundee)

Awaiting Construction0.7 MWData checked 16 November 2026Source record dated 18 September 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Stannergate Wastewater Pumping Station - Solar Farm is a 0.7 MW solar farm on the edge of Dundee, Tayside, United Kingdom. Its planning application (26/00375/FULL) went to Dundee City on 30 June 2026 and was granted on 21 August 2026. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 35 other energy sites within 10 km, 16 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Stannergate Wastewater Pumping Station - Solar Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1476, House fire reported to have started on solar panels in Carnoustie, 14 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-14762026House fire reported to have started on solar panels in Carnoustie14 kmSignificant
EIR-12382019Leak from solar heating system at Carnegie Leisure Centre Dunfermline55 kmMinor
EIR-20162022Solar panel fire evacuates Hawick High School117 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.7 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Scottish Water (Dundee)
Location
Wastewater Pumping Station Broughty Ferry Road, Tayside, DD4 7JP, United Kingdom
Planning authority
Dundee City
Planning application
26/00375/FULL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 26/00375/FULL, with what the planning evidence pack adds for this site.

Every application in Dundee City · Alerts for applications and incidents near here

  • 30 June 2026 Planning application submitted
  • 21 August 2026 Planning permission granted
  • 21 August 2029 Planning permission runs out

None found. The register holds no published incident that names Stannergate Wastewater Pumping Station - Solar Farm. If you know of one, report it (confidential reports are anonymised).

Has Stannergate Wastewater Pumping Station - Solar Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Stannergate Wastewater Pumping Station - Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Stannergate Wastewater Pumping Station - Solar Farm?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 18 September 2026.
Where is Stannergate Wastewater Pumping Station - Solar Farm?
On the edge of Dundee, Tayside, United Kingdom (postcode DD4 7JP).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).