Planning pack for this site, £295Other options

Solar · United Kingdom

Wormald Green Solar Farm

Operator Harmony Energy Limited

Awaiting Construction43 MWData checked 16 November 2026Source record dated 31 March 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Wormald Green Solar Farm is a 43 MW solar farm 7 km north of Knaresborough, North Yorkshire, United Kingdom. Its planning application (ZC23/04361/EIAMAJ) went to North Yorkshire on 4 December 2023 and was granted on 31 July 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 22 other energy sites within 10 km, 14 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

HARMONY ENERGY LIMITED (10141078), active, since 2016. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Wormald Green Solar Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-2771, Fire involves rooftop solar panels and lithium batteries on Bradford house roof, 37 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-27712024Fire involves rooftop solar panels and lithium batteries on Bradford house roof37 kmMinor
EIR-11752026Rooftop solar panel fire guts NHS mental health ward in Malton46 kmSignificant
EIR-15022025Storm Eowyn damages solar panels at Newton Aycliffe Leisure Centre62 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
43 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Harmony Energy Limited
Location
Land Comprising Field At 431305 464500 Station Lane Burton Leonard, North Yorkshire, HG3, United Kingdom
Planning authority
North Yorkshire
Planning application
ZC23/04361/EIAMAJ

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for ZC23/04361/EIAMAJ, with what the planning evidence pack adds for this site.

Every application in North Yorkshire · Alerts for applications and incidents near here

  • 4 December 2023 Planning application submitted
  • 31 July 2025 Planning permission granted
  • 31 July 2028 Planning permission runs out

None found. The register holds no published incident that names Wormald Green Solar Farm. If you know of one, report it (confidential reports are anonymised).

Has Wormald Green Solar Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Wormald Green Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Wormald Green Solar Farm?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 31 March 2026.
Where is Wormald Green Solar Farm?
7 km north of Knaresborough, North Yorkshire, United Kingdom (postcode HG3).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).