Woolbridge Solar Park

Operator Good Energy Generation · Owner Good Energy Group Limited

Operational5 MWData checked 16 November 2026Source record dated 23 August 2017

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Woolbridge Solar Park is a 5 MW solar farm 8 km west of Wareham, Dorset, United Kingdom. Its planning application (6/2013/0446) went to Dorset on 5 August 2013 and was granted on 10 December 2013. It has been operating since 18 June 2014. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 24 other energy sites within 10 km, 18 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 12 other sites and 196 energy sites within 40 km for Woolbridge Solar Park

Members see the sites and incidents around this one, and every record behind them.

GOOD ENERGY GENERATION LIMITED (02549857), active, since 1990. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Good Energy Generation
Owner
Good Energy Group Limited
Location
Tout Hill, Woolbridge, Dorset, BH20 6HH, United Kingdom
Planning authority
Dorset
Planning application
6/2013/0446
First operating
2014

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 6/2013/0446, with what the planning evidence pack adds for this site.

Every application in Dorset · Alerts for applications and incidents near here

  • 5 August 2013 Planning application submitted
  • 10 December 2013 Planning permission granted
  • 15 April 2014 Construction started
  • 18 June 2014 Operational

None found. The register holds no published incident that names Woolbridge Solar Park. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Woolbridge Solar Park had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Woolbridge Solar Park; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Woolbridge Solar Park?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 23 August 2017.
Where is Woolbridge Solar Park?
8 km west of Wareham, Dorset, United Kingdom (postcode BH20 6HH).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).