Onshore wind · United Kingdom
Windyhill Road (Dunbeg) Wind Farm
Operator Gaelectric Developments& CGN Europe Energy
Operational42 MWData checked 16 November 2026Source record dated 3 January 2017
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Windyhill Road (Dunbeg) Wind Farm is a 42 MW wind farm 5.2 km north-east of Limavady, Co. Derry / Londonderry, United Kingdom. Its planning application (B/2007/0560/FUL) went to Causeway Coast and Glens on 11 December 2007 and was granted on appeal on 27 January 2011. It has been operating since 14 November 2014. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 16 other energy sites within 10 km, 14 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Windyhill Road (Dunbeg) Wind Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Onshore wind
- Capacity
- 42 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Gaelectric Developments& CGN Europe Energy
- Location
- Picnic Area, Dunbeg Townland, Limavady, Co Londonderry. BT45, Co. Derry / Londonderry, United Kingdom
- Planning authority
- Causeway Coast and Glens
- Planning application
- B/2007/0560/FUL
- Appeal reference
- 2009/A0363
- First operating
- 2014
- Turbines
- 14
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for B/2007/0560/FUL, with what the planning evidence pack adds for this site.
Every application in Causeway Coast and Glens · Alerts for applications and incidents near here
Timeline
- 11 December 2007 Planning application submitted
- 18 March 2010 Planning permission refused
- 27 January 2011 Planning permission granted
- 27 January 2011 Appeal granted
- 1 December 2013 Construction started
- 14 November 2014 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Windyhill Road (Dunbeg) Wind Farm. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Windyhill Road (Dunbeg) Wind Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Windyhill Road (Dunbeg) Wind Farm; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Windyhill Road (Dunbeg) Wind Farm?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 3 January 2017.
- Where is Windyhill Road (Dunbeg) Wind Farm?
- 5.2 km north-east of Limavady, Co. Derry / Londonderry, United Kingdom.
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).