Inishative is a 13.8 MW wind farm 17 km north-west of Dungannon, Co. Tyrone, United Kingdom. Its planning application (K/2006/1793/F) went to Fermanagh and Omagh on 10 November 2006 and was granted on 12 November 2010. It has been operating since 13 March 2017. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 29 other energy sites within 10 km, 27 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

The operator's 7 other sites and 186 energy sites within 40 km for Inishative

Members see the sites and incidents around this one, and every record behind them.

Technology
Onshore wind
Capacity
13.8 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Gaelectric Developments& CGN Europe Energy
Location
Inishative Road, Sixmilecross, Omagh (Slievebeg. Land between Ballygawley and Pomeroy, approximately 1.5km north of Altmore Forest, Townland of Inishative), Co. Tyrone, United Kingdom
Planning authority
Fermanagh and Omagh
Planning application
K/2006/1793/F
First operating
2017
Turbines
6

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for K/2006/1793/F, with what the planning evidence pack adds for this site.

Every application in Fermanagh and Omagh · Alerts for applications and incidents near here

  • 10 November 2006 Planning application submitted
  • 12 November 2010 Planning permission granted
  • 17 February 2015 Construction started
  • 13 March 2017 Operational

None found. The register holds no published incident that names Inishative. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Inishative had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Inishative; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Inishative?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 3 July 2017.
Where is Inishative?
17 km north-west of Dungannon, Co. Tyrone, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).