Onshore wind · Germany

Windpark Neuengörs Repowering

Operator Bürgerwind II NW GmbH & Co. KG, Landwind II NW GmbH & Co. KG

Operational34 MWData checked 10 November 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Windpark Neuengörs Repowering is a 34 MW wind farm 6.9 km south-east of Bad Segeberg, Neuengörs, Segeberg, Schleswig-Holstein, Germany. It first operated in 2025. Its status in the Marktstammdatenregister (Bundesnetzagentur, Germany) is operational. There are 27 other energy sites within 10 km, 19 of them wind farms. The register holds no incident at this site. It holds 30 incidents at wind farms in Germany, and 351 worldwide.

258 energy sites within 40 km for Windpark Neuengörs Repowering

Members see the sites and incidents around this one, and every record behind them.

Technology
Onshore wind
Capacity
34 MW
Capacity figure from
Marktstammdatenregister (Bundesnetzagentur, Germany)
Status
Operational (In operation)
Operator
Bürgerwind II NW GmbH & Co. KG, Landwind II NW GmbH & Co. KG
Location
Neuengörs, Segeberg, Schleswig-Holstein, 23818, Germany
First operating
2025
Turbines
5

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

  • 8 May 2025 Operational

None found. The register holds no published incident that names Windpark Neuengörs Repowering. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Windpark Neuengörs Repowering had a fire or other incident?
None is on the register as of 11 November 2026. The register holds no published incident that names Windpark Neuengörs Repowering; it holds 30 incidents at wind farms in Germany.
What is the status of Windpark Neuengörs Repowering?
Operational, in the Marktstammdatenregister (Bundesnetzagentur, Germany).
Where is Windpark Neuengörs Repowering?
6.9 km south-east of Bad Segeberg, Neuengörs, Segeberg, Schleswig-Holstein, Germany (postcode 23818).

Source: Marktstammdatenregister, Bundesnetzagentur, Datenlizenz Deutschland, Namensnennung, Version 2.0 (www.govdata.de/dl-de/by-2-0). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).