Wind Turbine Development in Ballymoney

Operator Drumabest Farm Limited

Application Withdrawn0.3 MWData checked 16 November 2026Source record dated 13 January 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Wind Turbine Development in Ballymoney is a 0.3 MW wind farm 7.9 km east of Ballymoney, Co. Antrim, United Kingdom. Its planning application (LA01/2025/0125/F) went to Causeway Coast and Glens on 29 January 2025 and was withdrawn on 18 December 2025. Its status in the Renewable Energy Planning Database (UK government) is application withdrawn. There are 16 other energy sites within 10 km, 14 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

136 energy sites within 40 km for Wind Turbine Development in Ballymoney

Members see the sites and incidents around this one, and every record behind them.

Technology
Onshore wind
Capacity
0.3 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Withdrawn (Planning Application Withdrawn)
Operator or applicant
Drumabest Farm Limited
Location
Approximately 150m South East of 15 Pinehill Road, Kilraughts, Ballymoney, Co. Antrim, BT53 8NU, United Kingdom
Planning authority
Causeway Coast and Glens
Planning application
LA01/2025/0125/F
Turbines
1

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for LA01/2025/0125/F, with what the planning evidence pack adds for this site.

Every application in Causeway Coast and Glens · Alerts for applications and incidents near here

  • 29 January 2025 Planning application submitted
  • 18 December 2025 Application withdrawn

None found. The register holds no published incident that names Wind Turbine Development in Ballymoney. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Wind Turbine Development in Ballymoney had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Wind Turbine Development in Ballymoney; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Wind Turbine Development in Ballymoney?
Application Withdrawn, in the Renewable Energy Planning Database (UK government), where it last changed on 13 January 2026.
Where is Wind Turbine Development in Ballymoney?
7.9 km east of Ballymoney, Co. Antrim, United Kingdom (postcode BT53 8NU).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).