Onshore wind · United Kingdom
Wind Turbine Alterations in Enniskillen
Operator Conerick Power Limited
Awaiting ConstructionData checked 16 November 2026Source record dated 9 June 2026
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Wind Turbine Alterations in Enniskillen is a wind farm 4.9 km north-east of Enniskillen, Co. Tyrone, United Kingdom. Its planning application (LA10/2025/0180/F) went to Derry City and Strabane on 17 February 2025 and was granted on 6 May 2026. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 14 other energy sites within 10 km. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Wind Turbine Alterations in Enniskillen changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Wind Turbine Alterations in Enniskillen sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 49 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-0422, Wind turbine fire prompts fire service response in Fermanagh, 4.9 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-0422 | 2025 | Wind turbine fire prompts fire service response in Fermanagh | 4.9 km | Minor |
| EIR-1038 | 2017 | Wind turbine reported to have collapsed in Northern Ireland during severe storm | 47 km | Significant |
| EIR-1134 | 2017 | Wind turbine tower collapses at Kilgallioch Wind Farm, Ayrshire | 197 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 46 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Onshore wind
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- Conerick Power Limited
- Location
- Lands 190m North of Townview Farm, 10 Breagho Road, Breagho, Enniskillen, Co. Tyrone, BT74 4DE, United Kingdom
- Planning authority
- Derry City and Strabane
- Planning application
- LA10/2025/0180/F
- Turbines
- 1, 41.5 m to tip
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for LA10/2025/0180/F, with what the planning evidence pack adds for this site.
Every application in Derry City and Strabane · Alerts for applications and incidents near here
Timeline
- 17 February 2025 Planning application submitted
- 6 May 2026 Planning permission granted
- 6 May 2031 Planning permission runs out
Incidents on the register at this site
None found. The register holds no published incident that names Wind Turbine Alterations in Enniskillen. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Wind Turbine Alterations in Enniskillen had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Wind Turbine Alterations in Enniskillen; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Wind Turbine Alterations in Enniskillen?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 9 June 2026.
- Where is Wind Turbine Alterations in Enniskillen?
- 4.9 km north-east of Enniskillen, Co. Tyrone, United Kingdom (postcode BT74 4DE).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).