Onshore wind · United Kingdom

Killymendon (Replacement Turbine)

Operator Private Developer

Awaiting Construction0.3 MWData checked 16 November 2026Source record dated 7 April 2021

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Killymendon (Replacement Turbine) is a 0.3 MW wind farm 11 km north of Enniskillen, Co. Fermanagh, United Kingdom. Its planning application (LA10/2019/0978/F) went to Fermanagh and Omagh on 15 August 2019 and was granted on 11 March 2021. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 17 other energy sites within 10 km. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

PRIVATE DEVELOPER NETWORK LIMITED (09386318), dissolved, since 2015. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Killymendon (Replacement Turbine) sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 49 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-0422, Wind turbine fire prompts fire service response in Fermanagh, 1.7 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-04222025Wind turbine fire prompts fire service response in Fermanagh1.7 kmMinor
EIR-10382017Wind turbine reported to have collapsed in Northern Ireland during severe storm43 kmSignificant
EIR-11342017Wind turbine tower collapses at Kilgallioch Wind Farm, Ayrshire194 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 46 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Onshore wind
Capacity
0.3 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Private Developer
Location
255m East Of, 27 Dorney Bridge Road, Ballinamallard, Killymendon, Enniskillen, Co Fermanagh, Co. Fermanagh, BT94 2EF, United Kingdom
Planning authority
Fermanagh and Omagh
Planning application
LA10/2019/0978/F
Turbines
1, 50 m to tip

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for LA10/2019/0978/F, with what the planning evidence pack adds for this site.

Every application in Fermanagh and Omagh · Alerts for applications and incidents near here

  • 15 August 2019 Planning application submitted
  • 11 March 2021 Planning permission granted
  • 26 February 2026 Planning permission expired

None found. The register holds no published incident that names Killymendon (Replacement Turbine). If you know of one, report it (confidential reports are anonymised).

Has Killymendon (Replacement Turbine) had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Killymendon (Replacement Turbine); it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Killymendon (Replacement Turbine)?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 7 April 2021.
Where is Killymendon (Replacement Turbine)?
11 km north of Enniskillen, Co. Fermanagh, United Kingdom (postcode BT94 2EF).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).