Solar · United Kingdom

Wienerberger, Castle Road - Solar Panels

Operator Olympus Power · Owner Hefloc Limited

Awaiting Construction1.1 MWData checked 16 November 2026Source record dated 2 September 2024

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Wienerberger, Castle Road - Solar Panels is a 1.1 MW solar farm on the edge of Sittingbourne, Kent, United Kingdom. Its planning application (24/502478/PN14J) went to Swale on 19 June 2024 and was granted on 12 August 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 50 other energy sites within 10 km, 28 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

OLYMPUS POWER LTD (09682843), active, since 2015. 2 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Wienerberger, Castle Road - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1530, Electrical fault causes solar panel fire in Wickford house, 33 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15302023Electrical fault causes solar panel fire in Wickford house33 kmMinor
EIR-15372021Garage fire from overheated solar batteries in South Woodham Ferrers33 kmMinor
EIR-20692021Solar panel fire spreads through roof of new flats at Ebbsfleet41 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
1.1 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Olympus Power
Owner
Hefloc Limited
Location
Wienerberger, Concrete Tile Factory Smeed Dean Works, Castle Road, Eurolink, Sittingbourne, Kent, ME10 3TN, United Kingdom
Planning authority
Swale
Planning application
24/502478/PN14J

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 24/502478/PN14J, with what the planning evidence pack adds for this site.

Every application in Swale · Alerts for applications and incidents near here

  • 19 June 2024 Planning application submitted
  • 12 August 2024 Planning permission granted

None found. The register holds no published incident that names Wienerberger, Castle Road - Solar Panels. If you know of one, report it (confidential reports are anonymised).

Has Wienerberger, Castle Road - Solar Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Wienerberger, Castle Road - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Wienerberger, Castle Road - Solar Panels?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 2 September 2024.
Where is Wienerberger, Castle Road - Solar Panels?
On the edge of Sittingbourne, Kent, United Kingdom (postcode ME10 3TN).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).