Plot 2B EurolinkV

Operator Trenport Investments

Under Construction20 MWData checked 16 November 2026Source record dated 13 December 2021

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Plot 2B EurolinkV is a 20 MW battery storage site on the edge of Sittingbourne, Kent, United Kingdom. Its planning application (19/502257/FULL) went to Swale on 3 May 2019 and was granted on 25 July 2019. Construction started on 1 October 2021. Its status in the Renewable Energy Planning Database (UK government) is under construction. There are 50 other energy sites within 10 km, 14 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Plot 2B EurolinkV sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0109, Fire in single battery unit at Thurrock BESS under construction, 29 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-01092025Fire in single battery unit at Thurrock BESS under construction29 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire191 kmSignificant
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells235 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Capacity
20 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Under Construction
Operator or applicant
Trenport Investments
Location
Plot 2B Eurolink V, Sittingbourne, Land orth of Swale Way, Sittingbourne, Kent, ME9 9AR, United Kingdom
Planning authority
Swale
Planning application
19/502257/FULL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 19/502257/FULL, with what the planning evidence pack adds for this site.

Every application in Swale · Alerts for applications and incidents near here

  • 3 May 2019 Planning application submitted
  • 25 July 2019 Planning permission granted
  • 1 October 2021 Construction started

None found. The register holds no published incident that names Plot 2B EurolinkV. If you know of one, report it (confidential reports are anonymised).

Has Plot 2B EurolinkV had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Plot 2B EurolinkV; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Plot 2B EurolinkV?
Under Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 13 December 2021.
Where is Plot 2B EurolinkV?
On the edge of Sittingbourne, Kent, United Kingdom (postcode ME9 9AR).