Onshore wind · United Kingdom

Whiteside Hill

Operator Whiteside Hill Farm (Scotland)

Operational25.3 MWData checked 16 November 2026Source record dated 22 May 2018

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Whiteside Hill is a 25.3 MW wind farm 18 km south-east of Cumnock, Dumfries and Galloway, United Kingdom. Its planning application (06/P/3/0351) went to Dumfries and Galloway on 15 June 2006 and was granted on 26 February 2013. It has been operating since 30 April 2018. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 36 other energy sites within 10 km, 29 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

305 energy sites within 40 km for Whiteside Hill

Members see the sites and incidents around this one, and every record behind them.

7 Oct4 Nov
WholesaleBalancing mechanism

Full revenue and market view The pounds behind each bar, any period back to 2021, where it ranks against every site like it, who trades it, and a side-by-side with any other site.

29 settled days to 4 Nov: 3,147 MWh, running 78% of half hours, peak 12 MW of 25, load factor 18%. Members see what that output was worth at the market index price, half hour by half hour, and the rate per MW a year.

A day out costs this site about £15,854 at its earnings over the last 29 settled days (wholesale at the market index price). A figure from the market, not a claim: what the site earned, averaged, is what a day out forgoes.

Contains BMRS data © Elexon Limited copyright and database right (datasets B1610 and MID, the interim settlement run). Read each morning; a settled figure can be revised in later runs.

Technology
Onshore wind
Capacity
25.3 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Whiteside Hill Farm (Scotland)
Location
Whiteside Hill near Sanquhar, Dumfries and Galloway, United Kingdom
Planning authority
Dumfries and Galloway
Planning application
06/P/3/0351
First operating
2018
Turbines
11

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 06/P/3/0351, with what the planning evidence pack adds for this site.

Every application in Dumfries and Galloway · Alerts for applications and incidents near here

  • 15 June 2006 Planning application submitted
  • 26 February 2013 Planning permission granted
  • 15 January 2016 Construction started
  • 30 April 2018 Operational

None found. The register holds no published incident that names Whiteside Hill. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Whiteside Hill had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Whiteside Hill; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Whiteside Hill?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 22 May 2018.
Where is Whiteside Hill?
18 km south-east of Cumnock, Dumfries and Galloway, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).