Onshore wind · United Kingdom

Sandy Knowe Wind Farm

Operator ERG

Operational81.6 MWData checked 16 November 2026Source record dated 12 September 2023

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Sandy Knowe Wind Farm is a 81.6 MW wind farm 16 km south-east of Cumnock, Dumfries and Galloway, United Kingdom. Its planning application (ECU00000660) went to Scottish Government (S36) on 16 August 2018. It has been operating since 18 February 2023. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 34 other energy sites within 10 km, 27 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

The operator's 1 other site and 319 energy sites within 40 km for Sandy Knowe Wind Farm

Members see the sites and incidents around this one, and every record behind them.

7 Oct5 Nov
WholesaleBalancing mechanism

Full revenue and market view The pounds behind each bar, any period back to 2021, where it ranks against every site like it, who trades it, and a side-by-side with any other site.

30 settled days to 5 Nov: 5,467 MWh, running 54% of half hours, peak 43 MW of 82, load factor 10%. Members see what that output was worth at the market index price, half hour by half hour, and the rate per MW a year.

A day out costs this site about £34,687 at its earnings over the last 30 settled days (wholesale at the market index price). A figure from the market, not a claim: what the site earned, averaged, is what a day out forgoes.

Contains BMRS data © Elexon Limited copyright and database right (datasets B1610 and MID, the interim settlement run). Read each morning; a settled figure can be revised in later runs.

Technology
Onshore wind
Capacity
81.6 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
ERG
Location
Site Art Libry Moor, Locharbriggs, By Kirkconnel and Kelloholm, Dumfries and Galloway, DG1 1QF, United Kingdom
Planning authority
Scottish Government (S36)
Planning application
ECU00000660
First operating
2023
Turbines
24, 125 m to tip

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for ECU00000660, with what the planning evidence pack adds for this site.

Every application in Scottish Government (S36) · Alerts for applications and incidents near here

  • 16 August 2018 Planning application submitted
  • 12 October 2020 Construction started
  • 18 February 2023 Operational

None found. The register holds no published incident that names Sandy Knowe Wind Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Sandy Knowe Wind Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Sandy Knowe Wind Farm; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Sandy Knowe Wind Farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 12 September 2023.
Where is Sandy Knowe Wind Farm?
16 km south-east of Cumnock, Dumfries and Galloway, United Kingdom (postcode DG1 1QF).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).