Solar · United Kingdom

Wallerscote Limebeds - Solar Pv Park

Operator Infinis Solar Developments Limited & Green Earth Developments

Awaiting Construction22 MWData checked 16 November 2026Source record dated 5 August 2025

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Wallerscote Limebeds - Solar Pv Park is a 22 MW solar farm in Northwich, Cheshire, United Kingdom. Its planning application (23/02766/FUL) went to Cheshire West and Chester on 1 September 2023 and was granted on appeal on 21 July 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 16 other energy sites within 10 km, 13 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Wallerscote Limebeds - Solar Pv Park sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1244, Fire reported to have started in solar panels at Westleigh primary school, 26 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-12442018Fire reported to have started in solar panels at Westleigh primary school26 kmSignificant
EIR-14852026Faulty solar panel wiring sparks house fire in Stoke-on-Trent32 kmMinor
EIR-15462025Solar panel isolation switch overheats in roof fire at a house in Bucknall37 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
22 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Appeal Granted)
Operator or applicant
Infinis Solar Developments Limited & Green Earth Developments
Location
Winnington Avenue, Northwich, Cheshire, CW8 4ZE, United Kingdom
Planning authority
Cheshire West and Chester
Planning application
23/02766/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 23/02766/FUL, with what the planning evidence pack adds for this site.

Every application in Cheshire West and Chester · Alerts for applications and incidents near here

  • 1 September 2023 Planning application submitted
  • 23 July 2024 Planning permission refused
  • 21 July 2025 Planning permission granted
  • 21 July 2025 Appeal granted

None found. The register holds no published incident that names Wallerscote Limebeds - Solar Pv Park. If you know of one, report it (confidential reports are anonymised).

Has Wallerscote Limebeds - Solar Pv Park had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Wallerscote Limebeds - Solar Pv Park; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Wallerscote Limebeds - Solar Pv Park?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 5 August 2025.
Where is Wallerscote Limebeds - Solar Pv Park?
In Northwich, Cheshire, United Kingdom (postcode CW8 4ZE).