Solar · United Kingdom
Tiger Trailers, Road One - Solar Array
Operator Tiger Trailers
Awaiting Construction0.2 MWData checked 16 November 2026Source record dated 30 March 2022
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Tiger Trailers, Road One - Solar Array is a 0.2 MW solar farm on the edge of Winsford, Cheshire, United Kingdom. Its planning application (22/01072/P14) went to Cheshire West and Chester on 4 March 2022 and was granted on 3 May 2022. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 22 other energy sites within 10 km, 17 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Tiger Trailers, Road One - Solar Array changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Tiger Trailers, Road One - Solar Array sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1485, Faulty solar panel wiring sparks house fire in Stoke-on-Trent, 26 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1485 | 2026 | Faulty solar panel wiring sparks house fire in Stoke-on-Trent | 26 km | Minor |
| EIR-1546 | 2025 | Solar panel isolation switch overheats in roof fire at a house in Bucknall | 31 km | Minor |
| EIR-1244 | 2018 | Fire reported to have started in solar panels at Westleigh primary school | 33 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 0.2 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- Tiger Trailers
- Location
- Tiger Trailers Road One Winsford, Cheshire, CW7 3RL, United Kingdom
- Planning authority
- Cheshire West and Chester
- Planning application
- 22/01072/P14
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 22/01072/P14, with what the planning evidence pack adds for this site.
Every application in Cheshire West and Chester · Alerts for applications and incidents near here
Timeline
- 4 March 2022 Planning application submitted
- 3 May 2022 Planning permission granted
Incidents on the register at this site
None found. The register holds no published incident that names Tiger Trailers, Road One - Solar Array. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Tiger Trailers, Road One - Solar Array had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Tiger Trailers, Road One - Solar Array; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Tiger Trailers, Road One - Solar Array?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 30 March 2022.
- Where is Tiger Trailers, Road One - Solar Array?
- On the edge of Winsford, Cheshire, United Kingdom (postcode CW7 3RL).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).