Solar · United Kingdom

Stublach Project Solar Farm

Operator Storengy UK Limited

Awaiting Construction2.3 MWData checked 16 November 2026Source record dated 12 January 2021

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Stublach Project Solar Farm is a 2.3 MW solar farm 4.2 km north of Middlewich, Cheshire, United Kingdom. Its planning application (20/04118/FUL) went to Cheshire West and Chester on 4 November 2020 and was granted on 4 May 2021. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 20 other energy sites within 10 km, 15 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Stublach Project Solar Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1485, Faulty solar panel wiring sparks house fire in Stoke-on-Trent, 26 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-14852026Faulty solar panel wiring sparks house fire in Stoke-on-Trent26 kmMinor
EIR-12442018Fire reported to have started in solar panels at Westleigh primary school30 kmSignificant
EIR-15462025Solar panel isolation switch overheats in roof fire at a house in Bucknall31 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
2.3 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Storengy UK Limited
Location
Stublach Gas Storage Project, Cheshire, CW9 7SE, United Kingdom
Planning authority
Cheshire West and Chester
Planning application
20/04118/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 20/04118/FUL, with what the planning evidence pack adds for this site.

Every application in Cheshire West and Chester · Alerts for applications and incidents near here

  • 4 November 2020 Planning application submitted
  • 4 May 2021 Planning permission granted
  • 4 May 2024 Planning permission expired

None found. The register holds no published incident that names Stublach Project Solar Farm. If you know of one, report it (confidential reports are anonymised).

Has Stublach Project Solar Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Stublach Project Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Stublach Project Solar Farm?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 12 January 2021.
Where is Stublach Project Solar Farm?
4.2 km north of Middlewich, Cheshire, United Kingdom (postcode CW9 7SE).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).