Onshore wind · United Kingdom

Walkway

Operator Wind Prospect · Owner Rowan Onshore Windfarms Limited

Operational14 MWData checked 16 November 2026Source record dated 6 May 2009

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Walkway is a 14 MW wind farm 7.7 km south of Wingate, County Durham, United Kingdom. Its planning application went to County Durham on 1 November 2004 and was granted on 20 February 2005. It has been operating since 15 May 2008. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 56 other energy sites within 10 km, 14 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

The operator's 13 other sites and 456 energy sites within 40 km for Walkway

Members see the sites and incidents around this one, and every record behind them.

WIND PROSPECT LIMITED (03011376), voluntary-arrangement, since 1995. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Onshore wind
Capacity
14 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Wind Prospect
Owner
Rowan Onshore Windfarms Limited
Location
Sedgefield, County Durham, United Kingdom
Planning authority
County Durham
First operating
2008
Turbines
7

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page, with what the planning evidence pack adds for this site.

Every application in County Durham · Alerts for applications and incidents near here

  • 1 November 2004 Planning application submitted
  • 20 February 2005 Planning permission granted
  • 15 May 2008 Operational

None found. The register holds no published incident that names Walkway. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Walkway had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Walkway; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Walkway?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 6 May 2009.
Where is Walkway?
7.7 km south of Wingate, County Durham, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).