The Neville Hamlin Building, Thomas Wright Way - Solar Panels

Operator Centre for Process Innovation Limited

Awaiting Construction0.3 MWData checked 16 November 2026Source record dated 4 August 2023

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

The Neville Hamlin Building, Thomas Wright Way - Solar Panels is a 0.3 MW solar farm 6.4 km east of Ferryhill, Cleveland, United Kingdom. Its planning application (DM/23/01431/PNS) went to County Durham on 8 June 2023 and was granted on 28 July 2023. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 41 other energy sites within 10 km, 18 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for The Neville Hamlin Building, Thomas Wright Way - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1502, Storm Eowyn damages solar panels at Newton Aycliffe Leisure Centre, 9.0 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15022025Storm Eowyn damages solar panels at Newton Aycliffe Leisure Centre9.0 kmMinor
EIR-14992025Solar panels linked to fires at council buildings in Northumberland47 kmSignificant
EIR-27212025Solar panel fire breaks out at Shanklea Primary School47 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.3 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Centre for Process Innovation Limited
Location
The Neville Hamlin Building, National Printable Electronics Centre, Thomas Wright Way, Sedgefield, Stockton on Tees, Cleveland, TS21 3FG, United Kingdom
Planning authority
County Durham
Planning application
DM/23/01431/PNS

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for DM/23/01431/PNS, with what the planning evidence pack adds for this site.

Every application in County Durham · Alerts for applications and incidents near here

  • 8 June 2023 Planning application submitted
  • 28 July 2023 Planning permission granted

None found. The register holds no published incident that names The Neville Hamlin Building, Thomas Wright Way - Solar Panels. If you know of one, report it (confidential reports are anonymised).

Has The Neville Hamlin Building, Thomas Wright Way - Solar Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names The Neville Hamlin Building, Thomas Wright Way - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of The Neville Hamlin Building, Thomas Wright Way - Solar Panels?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 4 August 2023.
Where is The Neville Hamlin Building, Thomas Wright Way - Solar Panels?
6.4 km east of Ferryhill, Cleveland, United Kingdom (postcode TS21 3FG).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).