Planning pack for this site, £295Other options

Battery storage · Germany

W2_Powergrid_2

Operator Rolls-Royce Solutions

Planned3.8 MWData checked 10 November 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

W2_Powergrid_2 is a 3.8 MW battery storage site 3.6 km west of Friedrichshafen, Germany. It first operated in 2027. Its status in the Marktstammdatenregister (Bundesnetzagentur, Germany) is planned. There are 3 other energy sites within 10 km, one of them a battery storage site. The register holds no incident at this site. It holds 17 incidents at battery storage sites in Germany, and 196 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for W2_Powergrid_2 sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 8 comparable battery incidents in Germany, grid-scale only, nearest first. The nearest is EIR-2478, Battery storage unit fire releases gases in Obernzell, Germany, 326 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-24782026Battery storage unit fire releases gases in Obernzell, Germany326 kmSignificant
EIR-15862024Third battery fire at Suncycle site in Thuringia378 kmSignificant
EIR-24372024Battery container fire causes EUR 700,000 damage at German test centre378 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 5 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Usable capacity 4.1 MWh, Lithium-Batterie)
Capacity
3.8 MW
Capacity figure from
Marktstammdatenregister (Bundesnetzagentur, Germany)
Status
Planned (In planning)
Operator
Rolls-Royce Solutions
Location
Friedrichshafen, Bodenseekreis, Baden-Württemberg, 88048, Germany
First operating
2027

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names W2_Powergrid_2. If you know of one, report it (confidential reports are anonymised).

Has W2_Powergrid_2 had a fire or other incident?
None is on the register as of 11 November 2026. The register holds no published incident that names W2_Powergrid_2; it holds 17 incidents at battery storage sites in Germany.
What is the status of W2_Powergrid_2?
Planned, in the Marktstammdatenregister (Bundesnetzagentur, Germany).
Where is W2_Powergrid_2?
3.6 km west of Friedrichshafen, Germany (postcode 88048).

Source: Marktstammdatenregister, Bundesnetzagentur, Datenlizenz Deutschland, Namensnennung, Version 2.0 (www.govdata.de/dl-de/by-2-0). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).