← Back to Highland

Onshore wind · United Kingdom

Upper Smerral Wind Cluster

Operator Caithness Power

Application Refused2.7 MWData checked 16 November 2026Source record dated 30 September 2014

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Upper Smerral Wind Cluster is a 2.7 MW wind farm 26 km south-west of Wick, Highland, United Kingdom. Its planning application (13/03555/FUL) went to Highland on 19 September 2013 and was refused on 26 May 2014. Its status in the Renewable Energy Planning Database (UK government) is application refused. There are 16 other energy sites within 10 km, 14 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

The operator's 1 other site and 126 energy sites within 40 km for Upper Smerral Wind Cluster

Members see the sites and incidents around this one, and every record behind them.

Technology
Onshore wind
Capacity
2.7 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Refused (Planning Permission Refused)
Operator or applicant
Caithness Power
Location
Land 690M SE Of Newlands Of Houstry Dunbeath, Highland, United Kingdom
Planning authority
Highland
Planning application
13/03555/FUL
Turbines
3

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 13/03555/FUL, with what the planning evidence pack adds for this site.

Every application in Highland · Alerts for applications and incidents near here

  • 19 September 2013 Planning application submitted
  • 26 May 2014 Planning permission refused

None found. The register holds no published incident that names Upper Smerral Wind Cluster. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Upper Smerral Wind Cluster had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Upper Smerral Wind Cluster; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Upper Smerral Wind Cluster?
Application Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 30 September 2014.
Where is Upper Smerral Wind Cluster?
26 km south-west of Wick, Highland, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).