Solar · United Kingdom

Upper Pant-Ysgawen Farm/Crumlin

Operator Suncredit UK · Owner Pando Renewables LTD

Operational4.9 MWData checked 17 November 2026Source record dated 26 April 2017

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Upper Pant-Ysgawen Farm/Crumlin is a 4.9 MW solar farm in Crumlin, Caerphilly, United Kingdom. Its planning application (15/0512/FULL) went to Caerphilly on 22 July 2015 and was granted on 10 September 2015. It has been operating since 7 December 2016. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 30 other energy sites within 10 km, 11 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 3 other sites and 411 energy sites within 40 km for Upper Pant-Ysgawen Farm/Crumlin

Members see the sites and incidents around this one, and every record behind them.

SUNCREDIT UK LIMITED (08347687), active, since 2013. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
4.9 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Suncredit UK
Owner
Pando Renewables LTD
Location
Pant-Ysgawen Farm, Pant Ysgawen Farm Lane, Newbridge, Newport, Gwent, Caerphilly, NP11 4RJ, United Kingdom
Planning authority
Caerphilly
Planning application
15/0512/FULL
First operating
2016

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 15/0512/FULL, with what the planning evidence pack adds for this site.

Every application in Caerphilly · Alerts for applications and incidents near here

  • 22 July 2015 Planning application submitted
  • 10 September 2015 Planning permission granted
  • 15 February 2016 Construction started
  • 7 December 2016 Operational

None found. The register holds no published incident that names Upper Pant-Ysgawen Farm/Crumlin. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Upper Pant-Ysgawen Farm/Crumlin had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Upper Pant-Ysgawen Farm/Crumlin; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Upper Pant-Ysgawen Farm/Crumlin?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 26 April 2017.
Where is Upper Pant-Ysgawen Farm/Crumlin?
In Crumlin, Caerphilly, United Kingdom (postcode NP11 4RJ).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).