Solar · United Kingdom

Land at Box Road

Operator Suncredit UK · Owner Pando Renewables LTD

Operational2.2 MWData checked 17 November 2026Source record dated 14 June 2016

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Land at Box Road is a 2.2 MW solar farm 4.1 km north of Dursley, Gloucestershire, United Kingdom. Its planning application (S.15/1477/FUL) went to Stroud on 30 June 2015 and was granted on 29 September 2015. It has been operating since 24 March 2016. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 42 other energy sites within 10 km, 26 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 3 other sites and 482 energy sites within 40 km for Land at Box Road

Members see the sites and incidents around this one, and every record behind them.

SUNCREDIT UK LIMITED (08347687), active, since 2013. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
2.2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Suncredit UK
Owner
Pando Renewables LTD
Location
Land N/O Cam and Coaley Railway, Box Road, Cam, Dursley, Gloucestershire, Gloucestershire, GL11 5DJ, United Kingdom
Planning authority
Stroud
Planning application
S.15/1477/FUL
First operating
2016

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for S.15/1477/FUL, with what the planning evidence pack adds for this site.

Every application in Stroud · Alerts for applications and incidents near here

  • 30 June 2015 Planning application submitted
  • 29 September 2015 Planning permission granted
  • 15 February 2016 Construction started
  • 24 March 2016 Operational

None found. The register holds no published incident that names Land at Box Road. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Land at Box Road had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Land at Box Road; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Land at Box Road?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 14 June 2016.
Where is Land at Box Road?
4.1 km north of Dursley, Gloucestershire, United Kingdom (postcode GL11 5DJ).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).