Solar · United Kingdom

Upper Huntingford Farm

Operator Foresight

Operational7.7 MWData checked 16 November 2026Source record dated 4 September 2018

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Upper Huntingford Farm is a 7.7 MW solar farm 4.4 km west of Wotton-under-Edge, Gloucestershire, United Kingdom. Its planning application (S.14/0929/FUL) went to Stroud on 15 April 2014 and was granted on 14 July 2014. It has been operating since 16 January 2016. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 38 other energy sites within 10 km, 17 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 22 other sites and 525 energy sites within 40 km for Upper Huntingford Farm

Members see the sites and incidents around this one, and every record behind them.

FORESIGHT LIMITED (01845521), active, since 1984. 1 outstanding charge on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
7.7 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Foresight
Location
Upper Huntingford Farm Charfield, Wotton-Under-Edge, Gloucestershire, GL12 8EY, Gloucestershire, GL12 8EY, United Kingdom
Planning authority
Stroud
Planning application
S.14/0929/FUL
First operating
2016

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for S.14/0929/FUL, with what the planning evidence pack adds for this site.

Every application in Stroud · Alerts for applications and incidents near here

  • 15 April 2014 Planning application submitted
  • 14 July 2014 Planning permission granted
  • 28 June 2015 Construction started
  • 16 January 2016 Operational

None found. The register holds no published incident that names Upper Huntingford Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Upper Huntingford Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Upper Huntingford Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Upper Huntingford Farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 4 September 2018.
Where is Upper Huntingford Farm?
4.4 km west of Wotton-under-Edge, Gloucestershire, United Kingdom (postcode GL12 8EY).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).