← Back to East Sussex
Planning pack for this site, £295Other options

Solar · United Kingdom

Uckfield Solar Electric Forecourt

Operator Gridserve Sustainable Energy

Awaiting Construction5.5 MWData checked 16 November 2026Source record dated 30 April 2021

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Uckfield Solar Electric Forecourt is a 5.5 MW solar farm in Uckfield, East Sussex, United Kingdom. Its planning application (WD/2020/1244/MAJ) went to Wealden on 3 August 2020 and was granted on 16 March 2021. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 20 other energy sites within 10 km, 14 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Uckfield Solar Electric Forecourt sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1303, Solar panel inverter fault destroys two Lewes homes, 12 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-13032017Solar panel inverter fault destroys two Lewes homes12 kmSignificant
EIR-15222026Fire damages roof with one solar panel in The Charltons18 kmMinor
EIR-15272023Fire affects solar panels on nursing home roof in Woodingdean19 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
5.5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Gridserve Sustainable Energy
Location
Land At Copwood Barn, Rocks Road, Uckfield, East Sussex, East Sussex, TN22 3PT, United Kingdom
Planning authority
Wealden
Planning application
WD/2020/1244/MAJ

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for WD/2020/1244/MAJ, with what the planning evidence pack adds for this site.

Every application in Wealden · Alerts for applications and incidents near here

  • 3 August 2020 Planning application submitted
  • 16 March 2021 Planning permission granted
  • 16 March 2024 Planning permission expired

None found. The register holds no published incident that names Uckfield Solar Electric Forecourt. If you know of one, report it (confidential reports are anonymised).

Has Uckfield Solar Electric Forecourt had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Uckfield Solar Electric Forecourt; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Uckfield Solar Electric Forecourt?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 30 April 2021.
Where is Uckfield Solar Electric Forecourt?
In Uckfield, East Sussex, United Kingdom (postcode TN22 3PT).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).