Solar · United Kingdom
Tyn y Pant
Operator Solar Power Parks
Application Refused1.6 MWData checked 16 November 2026Source record dated 1 November 2016
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Tyn y Pant is a 1.6 MW solar farm 6.5 km north-east of Ystalyfera, Powys, United Kingdom. Its planning application (P/2015/1013) went to Powys on 3 December 2015 and was refused on 18 October 2016. Its status in the Renewable Energy Planning Database (UK government) is application refused. There are 12 other energy sites within 10 km, 4 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Tyn y Pant changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Solar
- Capacity
- 1.6 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Application Refused (Planning Permission Refused)
- Operator or applicant
- Solar Power Parks
- Location
- Tyn Y Pant Farm, Caehopkin, Abercrave, Swansea, Powys, SA9 1UE, United Kingdom
- Planning authority
- Powys
- Planning application
- P/2015/1013
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for P/2015/1013, with what the planning evidence pack adds for this site.
Every application in Powys · Alerts for applications and incidents near here
Timeline
- 3 December 2015 Planning application submitted
- 18 October 2016 Planning permission refused
Incidents on the register at this site
None found. The register holds no published incident that names Tyn y Pant. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Tyn y Pant had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Tyn y Pant; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Tyn y Pant?
- Application Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 1 November 2016.
- Where is Tyn y Pant?
- 6.5 km north-east of Ystalyfera, Powys, United Kingdom (postcode SA9 1UE).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).