← Back to Powys

Solar · United Kingdom

Tyn y Pant

Operator Solar Power Parks

Application Refused1.6 MWData checked 16 November 2026Source record dated 1 November 2016

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Tyn y Pant is a 1.6 MW solar farm 6.5 km north-east of Ystalyfera, Powys, United Kingdom. Its planning application (P/2015/1013) went to Powys on 3 December 2015 and was refused on 18 October 2016. Its status in the Renewable Energy Planning Database (UK government) is application refused. There are 12 other energy sites within 10 km, 4 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

297 energy sites within 40 km for Tyn y Pant

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
1.6 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Refused (Planning Permission Refused)
Operator or applicant
Solar Power Parks
Location
Tyn Y Pant Farm, Caehopkin, Abercrave, Swansea, Powys, SA9 1UE, United Kingdom
Planning authority
Powys
Planning application
P/2015/1013

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for P/2015/1013, with what the planning evidence pack adds for this site.

Every application in Powys · Alerts for applications and incidents near here

  • 3 December 2015 Planning application submitted
  • 18 October 2016 Planning permission refused

None found. The register holds no published incident that names Tyn y Pant. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Tyn y Pant had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Tyn y Pant; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Tyn y Pant?
Application Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 1 November 2016.
Where is Tyn y Pant?
6.5 km north-east of Ystalyfera, Powys, United Kingdom (postcode SA9 1UE).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).