Onshore wind · United Kingdom
Twentyshilling Hill Wind Farm
Operator Element Power
Under Construction37.8 MWData checked 16 November 2026Source record dated 11 January 2022
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Twentyshilling Hill Wind Farm is a 37.8 MW wind farm 28 km south-east of Cumnock, Dumfries and Galloway, United Kingdom. Its planning application (18/0206/FUL) went to Dumfries and Galloway on 22 February 2018 and was granted on 23 December 2019. Construction started on 1 July 2020. Its status in the Renewable Energy Planning Database (UK government) is under construction. There are 11 other energy sites within 10 km, 9 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Twentyshilling Hill Wind Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Twentyshilling Hill Wind Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 49 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-1025, Worker dies after becoming stranded at Afton wind farm, 30 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1025 | 2018 | Worker dies after becoming stranded at Afton wind farm | 30 km | Major |
| EIR-0922 | 2011 | Vestas turbine nacelle fire at Ardrossan wind farm during storm | 43 km | Significant |
| EIR-0911 | 2017 | Worker dies after fall from turbine at Whitelee windfarm near Glasgow | 52 km | Major |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 46 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Onshore wind
- Capacity
- 37.8 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Under Construction
- Operator or applicant
- Element Power
- Location
- Twentyshilling Hill Wind Farm, Greystone Avenue, Kelloholm, Sanquhar, Dumfries and Galloway, DG4 6RY, United Kingdom
- Planning authority
- Dumfries and Galloway
- Planning application
- 18/0206/FUL
- Turbines
- 9, 82 m to tip
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 18/0206/FUL, with what the planning evidence pack adds for this site.
Every application in Dumfries and Galloway · Alerts for applications and incidents near here
Timeline
- 22 February 2018 Planning application submitted
- 23 December 2019 Planning permission granted
- 1 July 2020 Construction started
Incidents on the register at this site
None found. The register holds no published incident that names Twentyshilling Hill Wind Farm. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Twentyshilling Hill Wind Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Twentyshilling Hill Wind Farm; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Twentyshilling Hill Wind Farm?
- Under Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 11 January 2022.
- Where is Twentyshilling Hill Wind Farm?
- 28 km south-east of Cumnock, Dumfries and Galloway, United Kingdom (postcode DG4 6RY).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).