Onshore wind · United Kingdom
Cloud Hill Wind Farm
Operator Blue Energy Company & BayWa r.e. UK Limited
Awaiting Construction56 MWData checked 16 November 2026Source record dated 8 January 2026
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Cloud Hill Wind Farm is a 56 MW wind farm 23 km south-east of Cumnock, Dumfries and Galloway, United Kingdom. Its planning application (ECU00003461) went to Scottish Government (S36) on 3 October 2023 and was granted on 16 December 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 29 other energy sites within 10 km, 22 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Cloud Hill Wind Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Cloud Hill Wind Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 49 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-1025, Worker dies after becoming stranded at Afton wind farm, 26 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1025 | 2018 | Worker dies after becoming stranded at Afton wind farm | 26 km | Major |
| EIR-0922 | 2011 | Vestas turbine nacelle fire at Ardrossan wind farm during storm | 38 km | Significant |
| EIR-0911 | 2017 | Worker dies after fall from turbine at Whitelee windfarm near Glasgow | 50 km | Major |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 46 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Onshore wind
- Capacity
- 56 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- Blue Energy Company & BayWa r.e. UK Limited
- Location
- Blackaddie Road, Sanquhar, Dumfries and Galloway, DG4 6DF, United Kingdom
- Planning authority
- Scottish Government (S36)
- Planning application
- ECU00003461
- Turbines
- 10, 180 m to tip
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for ECU00003461, with what the planning evidence pack adds for this site.
Every application in Scottish Government (S36) · Alerts for applications and incidents near here
Timeline
- 3 October 2023 Planning application submitted
- 16 December 2025 Planning permission granted
- 16 December 2030 Planning permission runs out
Incidents on the register at this site
None found. The register holds no published incident that names Cloud Hill Wind Farm. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Cloud Hill Wind Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Cloud Hill Wind Farm; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Cloud Hill Wind Farm?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 8 January 2026.
- Where is Cloud Hill Wind Farm?
- 23 km south-east of Cumnock, Dumfries and Galloway, United Kingdom (postcode DG4 6DF).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).