Solar · United Kingdom

Tunbridge Wells South Wastewater Treatment Works, Broom Lane - PV Array

Operator Southern Water Services Limited · Owner Sws Holdings Limited

Awaiting Construction0.7 MWData checked 16 November 2026Source record dated 20 December 2023

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Tunbridge Wells South Wastewater Treatment Works, Broom Lane - PV Array is a 0.7 MW solar farm 3.7 km west of Royal Tunbridge Wells, Kent, United Kingdom. Its planning application (23/02818/LAWPRO) went to Tunbridge Wells on 23 October 2023 and was granted on 18 December 2023. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 13 other energy sites within 10 km, 11 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

SOUTHERN WATER SERVICES LIMITED (02366670), active, since 1989. 3 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Tunbridge Wells South Wastewater Treatment Works, Broom Lane - PV Array sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1303, Solar panel inverter fault destroys two Lewes homes, 31 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-13032017Solar panel inverter fault destroys two Lewes homes31 kmSignificant
EIR-15222026Fire damages roof with one solar panel in The Charltons37 kmMinor
EIR-24472024Inverter fire on rooftop solar equipment at Sainsbury's store in Sutton37 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.7 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Southern Water Services Limited
Owner
Sws Holdings Limited
Location
Tunbridge Wells South Wastewater Treatment Works, Broom Lane, Groombridge, Tunbridge Wells, Kent, TN3 9JL, United Kingdom
Planning authority
Tunbridge Wells
Planning application
23/02818/LAWPRO

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 23/02818/LAWPRO, with what the planning evidence pack adds for this site.

Every application in Tunbridge Wells · Alerts for applications and incidents near here

  • 23 October 2023 Planning application submitted
  • 18 December 2023 Planning permission granted

None found. The register holds no published incident that names Tunbridge Wells South Wastewater Treatment Works, Broom Lane - PV Array. If you know of one, report it (confidential reports are anonymised).

Has Tunbridge Wells South Wastewater Treatment Works, Broom Lane - PV Array had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Tunbridge Wells South Wastewater Treatment Works, Broom Lane - PV Array; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Tunbridge Wells South Wastewater Treatment Works, Broom Lane - PV Array?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 20 December 2023.
Where is Tunbridge Wells South Wastewater Treatment Works, Broom Lane - PV Array?
3.7 km west of Royal Tunbridge Wells, Kent, United Kingdom (postcode TN3 9JL).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).