Homebase Linden Park Road is a 0.2 MW solar farm in Royal Tunbridge Wells, Kent, United Kingdom. Its planning application (20/00920/PN14J) went to Tunbridge Wells on 25 March 2020 and was granted on 15 May 2020. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 19 other energy sites within 10 km, 15 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Homebase Linden Park Road changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Homebase Linden Park Road sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1303, Solar panel inverter fault destroys two Lewes homes, 33 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1303 | 2017 | Solar panel inverter fault destroys two Lewes homes | 33 km | Significant |
| EIR-1522 | 2026 | Fire damages roof with one solar panel in The Charltons | 39 km | Minor |
| EIR-1305 | 2017 | Fire at Thornton Heath flats reported to have been caused by an overheated solar panel | 39 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 0.2 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- Orchard Street Investment Management
- Location
- Homebase Ltd, Linden Park Road, Tunbridge Wells, Kent, TN2 5QL, United Kingdom
- Planning authority
- Tunbridge Wells
- Planning application
- 20/00920/PN14J
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 20/00920/PN14J, with what the planning evidence pack adds for this site.
Every application in Tunbridge Wells · Alerts for applications and incidents near here
Timeline
- 25 March 2020 Planning application submitted
- 15 May 2020 Planning permission granted
Incidents on the register at this site
None found. The register holds no published incident that names Homebase Linden Park Road. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Homebase Linden Park Road had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Homebase Linden Park Road; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Homebase Linden Park Road?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 30 June 2020.
- Where is Homebase Linden Park Road?
- In Royal Tunbridge Wells, Kent, United Kingdom (postcode TN2 5QL).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).