Solar · United Kingdom
Tuesley Farm, Tuesley Lane - Solar Array
Operator Hall Hunter Partnership
Awaiting Construction1 MWData checked 16 November 2026Source record dated 1 April 2025
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Tuesley Farm, Tuesley Lane - Solar Array is a 1 MW solar farm on the edge of Milford, Surrey, United Kingdom. Its planning application (WA/2023/01667) went to Waverley on 28 July 2023 and was granted on 29 November 2023. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 12 other energy sites within 10 km, 9 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Tuesley Farm, Tuesley Lane - Solar Array changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Tuesley Farm, Tuesley Lane - Solar Array sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1531, Fire involving solar panels damages roof of flats in Fleet, 18 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1531 | 2022 | Fire involving solar panels damages roof of flats in Fleet | 18 km | Significant |
| EIR-1273 | 2022 | Solar panels believed to have started roof fire at house in Old Basing | 32 km | Minor |
| EIR-2085 | 2020 | Fire involving solar panels at a house in Barnham, West Sussex | 37 km | Minor |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 1 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- Hall Hunter Partnership
- Location
- Tuesley Farm, Tuesley Lane, Godalming, Surrey, GU7 1UG, United Kingdom
- Planning authority
- Waverley
- Planning application
- WA/2023/01667
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for WA/2023/01667, with what the planning evidence pack adds for this site.
Every application in Waverley · Alerts for applications and incidents near here
Timeline
- 28 July 2023 Planning application submitted
- 29 November 2023 Planning permission granted
- 29 November 2026 Planning permission runs out
Incidents on the register at this site
None found. The register holds no published incident that names Tuesley Farm, Tuesley Lane - Solar Array. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Tuesley Farm, Tuesley Lane - Solar Array had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Tuesley Farm, Tuesley Lane - Solar Array; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Tuesley Farm, Tuesley Lane - Solar Array?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 1 April 2025.
- Where is Tuesley Farm, Tuesley Lane - Solar Array?
- On the edge of Milford, Surrey, United Kingdom (postcode GU7 1UG).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).