← Back to Surrey
Planning pack for this site, £295Other options

Solar · United Kingdom

Eashing Farm

Operator Solar Power South

Revised7 MWData checked 16 November 2026Source record dated 17 March 2014

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Eashing Farm is a 7 MW solar farm on the edge of Milford, Surrey, United Kingdom. Its planning application (13/P/01737) went to Guildford on 16 October 2013 and was refused on 15 January 2014. Its status in the Renewable Energy Planning Database (UK government) is revised. There are 15 other energy sites within 10 km, 11 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

SOLAR POWER SOUTH LIMITED (07384592), dissolved, since 2010. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Eashing Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1531, Fire involving solar panels damages roof of flats in Fleet, 16 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15312022Fire involving solar panels damages roof of flats in Fleet16 kmSignificant
EIR-12732022Solar panels believed to have started roof fire at house in Old Basing30 kmMinor
EIR-29392026Rooftop solar fire forces West Drayton school to close early37 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
7 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Revised
Operator or applicant
Solar Power South
Location
Land at Eashing Farm, Eashing Lane, Godalming, Surrey, United Kingdom
Planning authority
Guildford
Planning application
13/P/01737

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 13/P/01737, with what the planning evidence pack adds for this site.

Every application in Guildford · Alerts for applications and incidents near here

  • 16 October 2013 Planning application submitted
  • 15 January 2014 Planning permission refused

None found. The register holds no published incident that names Eashing Farm. If you know of one, report it (confidential reports are anonymised).

Has Eashing Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Eashing Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Eashing Farm?
Revised, in the Renewable Energy Planning Database (UK government), where it last changed on 17 March 2014.
Where is Eashing Farm?
On the edge of Milford, Surrey, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).