← Back to Devon

Solar · United Kingdom

Trentworthy Solar Farm

Operator Private Developer

Application Withdrawn5 MWData checked 16 November 2026Source record dated 24 August 2011

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Trentworthy Solar Farm is a 5 MW solar farm 12 km north-east of Bude, Devon, United Kingdom. Its planning application (1/1132/2010/FULM) went to Torridge on 4 January 2011 and was withdrawn on 20 April 2011. Its status in the Renewable Energy Planning Database (UK government) is application withdrawn. There are 11 other energy sites within 10 km, 5 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 409 other sites and 154 energy sites within 40 km for Trentworthy Solar Farm

Members see the sites and incidents around this one, and every record behind them.

PRIVATE DEVELOPER NETWORK LIMITED (09386318), dissolved, since 2015. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Withdrawn (Planning Application Withdrawn)
Operator or applicant
Private Developer
Location
Youlstone, Holsworthy, Devon, Devon, EX22 7SB, United Kingdom
Planning authority
Torridge
Planning application
1/1132/2010/FULM

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 1/1132/2010/FULM, with what the planning evidence pack adds for this site.

Every application in Torridge · Alerts for applications and incidents near here

  • 4 January 2011 Planning application submitted
  • 20 April 2011 Application withdrawn

None found. The register holds no published incident that names Trentworthy Solar Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Trentworthy Solar Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Trentworthy Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Trentworthy Solar Farm?
Application Withdrawn, in the Renewable Energy Planning Database (UK government), where it last changed on 24 August 2011.
Where is Trentworthy Solar Farm?
12 km north-east of Bude, Devon, United Kingdom (postcode EX22 7SB).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).