Solar · United Kingdom

Chester Energy (East Woolley Farm)

Operator Chester Energy (Eastcott)

Operational5 MWData checked 16 November 2026Source record dated 22 November 2012

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Chester Energy (East Woolley Farm) is a 5 MW solar farm 12 km north of Bude, Cornwall, United Kingdom. Its planning application (PA10/08695) went to Cornwall on 17 December 2010 and was granted on 18 April 2011. It has been operating since 1 June 2012. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 9 other energy sites within 10 km, 3 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

148 energy sites within 40 km for Chester Energy (East Woolley Farm)

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Chester Energy (Eastcott)
Location
Land East Of East Woolley Farm, Morwenstow, Bude, Cornwall, Cornwall, EX23 9PP, United Kingdom
Planning authority
Cornwall
Planning application
PA10/08695
First operating
2012

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for PA10/08695, with what the planning evidence pack adds for this site.

Every application in Cornwall · Alerts for applications and incidents near here

  • 17 December 2010 Planning application submitted
  • 18 April 2011 Planning permission granted
  • 1 June 2012 Operational

None found. The register holds no published incident that names Chester Energy (East Woolley Farm). If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Chester Energy (East Woolley Farm) had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Chester Energy (East Woolley Farm); it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Chester Energy (East Woolley Farm)?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 22 November 2012.
Where is Chester Energy (East Woolley Farm)?
12 km north of Bude, Cornwall, United Kingdom (postcode EX23 9PP).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).