← Back to Cornwall
Planning pack for this site, £295Other options

Solar · United Kingdom

Trenake Farm, Pelynt - Solar PV Array

Operator Trenake Manor Farm & Clean Earth Energy

Awaiting Construction0.2 MWData checked 16 November 2026Source record dated 14 December 2022

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Trenake Farm, Pelynt - Solar PV Array is a 0.2 MW solar farm 6.5 km west of Looe, Cornwall, United Kingdom. Its planning application (PA22/08796) went to Cornwall on 31 October 2022 and was granted on 13 December 2022. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 7 other energy sites within 10 km. The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Trenake Farm, Pelynt - Solar PV Array sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1541, Transformer unit fire at a solar farm on Copshorn Road, Bodmin, 17 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15412015Transformer unit fire at a solar farm on Copshorn Road, Bodmin17 kmMinor
EIR-15442014Fire at solar panel installation near Bodmin Jail17 kmMinor
EIR-15282023Fire at solar farm conversion unit in Roche extinguished21 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Trenake Manor Farm & Clean Earth Energy
Location
Trenake Farm, Pelynt, Looe, Cornwall, PL13 2LT, United Kingdom
Planning authority
Cornwall
Planning application
PA22/08796

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for PA22/08796, with what the planning evidence pack adds for this site.

Every application in Cornwall · Alerts for applications and incidents near here

  • 31 October 2022 Planning application submitted
  • 13 December 2022 Planning permission granted
  • 13 December 2025 Planning permission expired

None found. The register holds no published incident that names Trenake Farm, Pelynt - Solar PV Array. If you know of one, report it (confidential reports are anonymised).

Has Trenake Farm, Pelynt - Solar PV Array had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Trenake Farm, Pelynt - Solar PV Array; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Trenake Farm, Pelynt - Solar PV Array?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 14 December 2022.
Where is Trenake Farm, Pelynt - Solar PV Array?
6.5 km west of Looe, Cornwall, United Kingdom (postcode PL13 2LT).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).