Planning Permission Expired8.9 MWData checked 16 November 2026Source record dated 9 February 2022
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Trecoed Farm is a 8.9 MW solar farm 17 km north of Haverfordwest, Pembrokeshire, United Kingdom. Its planning application (18/0858/PA) went to Pembrokeshire on 26 November 2018 and was granted on 18 March 2022. Its status in the Renewable Energy Planning Database (UK government) is planning permission expired. There are 10 other energy sites within 10 km, 2 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Trecoed Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Solar
- Capacity
- 8.9 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Planning Permission Expired
- Operator or applicant
- Transition Bro Gwaun
- Location
- Trecoed Farm, Letterston, Haverfordwest, Pembrokeshire, SA62 5UN, United Kingdom
- Planning authority
- Pembrokeshire
- Planning application
- 18/0858/PA
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 18/0858/PA, with what the planning evidence pack adds for this site.
Every application in Pembrokeshire · Alerts for applications and incidents near here
Timeline
- 26 November 2018 Planning application submitted
- 18 March 2022 Planning permission granted
- 10 April 2023 Planning permission expired
Incidents on the register at this site
None found. The register holds no published incident that names Trecoed Farm. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Trecoed Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Trecoed Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Trecoed Farm?
- Planning Permission Expired, in the Renewable Energy Planning Database (UK government), where it last changed on 9 February 2022.
- Where is Trecoed Farm?
- 17 km north of Haverfordwest, Pembrokeshire, United Kingdom (postcode SA62 5UN).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).