Solar · United Kingdom

Trecoed Farm

Operator Transition Bro Gwaun

Planning Permission Expired8.9 MWData checked 16 November 2026Source record dated 9 February 2022

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Trecoed Farm is a 8.9 MW solar farm 17 km north of Haverfordwest, Pembrokeshire, United Kingdom. Its planning application (18/0858/PA) went to Pembrokeshire on 26 November 2018 and was granted on 18 March 2022. Its status in the Renewable Energy Planning Database (UK government) is planning permission expired. There are 10 other energy sites within 10 km, 2 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

93 energy sites within 40 km for Trecoed Farm

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
8.9 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Planning Permission Expired
Operator or applicant
Transition Bro Gwaun
Location
Trecoed Farm, Letterston, Haverfordwest, Pembrokeshire, SA62 5UN, United Kingdom
Planning authority
Pembrokeshire
Planning application
18/0858/PA

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 18/0858/PA, with what the planning evidence pack adds for this site.

Every application in Pembrokeshire · Alerts for applications and incidents near here

  • 26 November 2018 Planning application submitted
  • 18 March 2022 Planning permission granted
  • 10 April 2023 Planning permission expired

None found. The register holds no published incident that names Trecoed Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Trecoed Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Trecoed Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Trecoed Farm?
Planning Permission Expired, in the Renewable Energy Planning Database (UK government), where it last changed on 9 February 2022.
Where is Trecoed Farm?
17 km north of Haverfordwest, Pembrokeshire, United Kingdom (postcode SA62 5UN).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).