Onshore wind · United Kingdom
Jordanston Wind Farm
Operator RWE npower
Application Refused9.8 MWData checked 16 November 2026Source record dated 4 July 2001
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Jordanston Wind Farm is a 9.8 MW wind farm 17 km north of Haverfordwest, Dyfed, United Kingdom. Its planning application (97/520) went to Pembrokeshire on 30 September 1997 and was refused on 1 September 2001. Its status in the Renewable Energy Planning Database (UK government) is application refused. There are 10 other energy sites within 10 km, 6 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Jordanston Wind Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Onshore wind
- Capacity
- 9.8 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Application Refused (Planning Permission Refused)
- Operator or applicant
- RWE npower
- Location
- Land at Jordanston south of Fishguard Dyfed, Dyfed, United Kingdom
- Planning authority
- Pembrokeshire
- Planning application
- 97/520
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 97/520, with what the planning evidence pack adds for this site.
Every application in Pembrokeshire · Alerts for applications and incidents near here
Timeline
- 30 September 1997 Planning application submitted
- 1 September 2001 Planning permission refused
Incidents on the register at this site
None found. The register holds no published incident that names Jordanston Wind Farm. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Jordanston Wind Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Jordanston Wind Farm; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Jordanston Wind Farm?
- Application Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 4 July 2001.
- Where is Jordanston Wind Farm?
- 17 km north of Haverfordwest, Dyfed, United Kingdom.
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).