Battery storage · United States
Townsite Solar Project Hybrid
Operator Townsite Solar, LLC
Operational90 MWData checked 12 November 2026
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Townsite Solar Project Hybrid is a 90 MW battery storage site 6.5 km south-west of Boulder City, Clark County, Nevada, United States. It first operated in 2021. Its status in the U.S. Energy Information Administration, Form EIA-860M is operational. There are 6 other energy sites within 10 km. The register holds one incident at this site, the latest in 2025.
Incidents on the register at this site
A fire broke out in a battery storage unit at the Townsite Solar and Storage facility in Boulder City, Nevada, operated and owned by Arevon Energy, with battery systems supplied by Tesla and the plant built by EPC contractor Rosendin. Fire crews arrived...
Matched by the site's name in the entry's own reporting. If one is wrong, tell the editor.
Get an email when Townsite Solar Project Hybrid changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, battery storage incidents in the United States. No account needed; unsubscribe in one click.
Confirm your email and every battery storage incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Battery storage (360 MWh)
- Capacity
- 90 MW
- Capacity figure from
- U.S. Energy Information Administration, Form EIA-860M
- Status
- Operational
- Operator
- Townsite Solar, LLC
- Owner
- Townsite Solar, LLC
- Location
- Clark County, Nevada, United States
- First operating
- 2021
- Balancing authority
- WALC
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Townsite Solar Project Hybrid had a fire or other incident?
- Yes. The register holds one incident that names it: Battery units ignite at Townsite Solar and Storage in Boulder City, Nevada (EIR-0101, 2025).
- What is the status of Townsite Solar Project Hybrid?
- Operational, in the U.S. Energy Information Administration, Form EIA-860M.
- Where is Townsite Solar Project Hybrid?
- 6.5 km south-west of Boulder City, Clark County, Nevada, United States.
Source: U.S. Energy Information Administration, Form EIA-860M (Preliminary Monthly Electric Generator Inventory). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).