← Back to Nevada

Solar · United States

Copper Mountain Solar 3

Operator RWE Americas, LLC · Owner RWE Clean Energy

Operational255 MWData checked 12 November 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Copper Mountain Solar 3 is a 255 MW solar farm 15 km south-west of Boulder City, Clark County, Nevada, United States. It first operated in 2014. Its status in the U.S. Energy Information Administration, Form EIA-860M is operational. There are 17 other energy sites within 10 km, 10 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 168 incidents at solar farms (hybrid battery and solar sites included) in the United States, and 480 worldwide.

The operator's 184 other sites and 69 energy sites within 40 km for Copper Mountain Solar 3

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
255 MW
Capacity figure from
U.S. Energy Information Administration, Form EIA-860M
Status
Operational
Operator
RWE Americas, LLC
Owner
RWE Clean Energy
Location
Clark County, Nevada, United States
First operating
2014
Balancing authority
LDWP

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names Copper Mountain Solar 3. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Copper Mountain Solar 3 had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Copper Mountain Solar 3; it holds 168 incidents at solar farms (hybrid battery and solar sites included) in the United States.
What is the status of Copper Mountain Solar 3?
Operational, in the U.S. Energy Information Administration, Form EIA-860M.
Where is Copper Mountain Solar 3?
15 km south-west of Boulder City, Clark County, Nevada, United States.

Source: U.S. Energy Information Administration, Form EIA-860M (Preliminary Monthly Electric Generator Inventory). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).