Townsend Farm

Operator Townsend Solar Farm

Appeal Refused4.9 MWData checked 16 November 2026Source record dated 29 March 2017

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Townsend Farm is a 4.9 MW solar farm 3.7 km north-west of Cheddar, Somerset, United Kingdom. Its planning application (02/15/00019) went to Somerset on 18 September 2015 and was refused on appeal on 22 March 2017. Its status in the Renewable Energy Planning Database (UK government) is appeal refused. There are 40 other energy sites within 10 km, 27 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

528 energy sites within 40 km for Townsend Farm

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
4.9 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Appeal Refused
Operator or applicant
Townsend Solar Farm
Location
Land to the S/o Townsend Farm, Townsend, Axbridge, Somerset, United Kingdom
Planning authority
Somerset
Planning application
02/15/00019
Appeal reference
APP/V3310/W/16/3141866

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 02/15/00019, with what the planning evidence pack adds for this site.

Every application in Somerset · Alerts for applications and incidents near here

  • 18 September 2015 Planning application submitted
  • 17 December 2015 Planning permission refused
  • 4 May 2016 Appeal lodged
  • 22 March 2017 Appeal refused

None found. The register holds no published incident that names Townsend Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Townsend Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Townsend Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Townsend Farm?
Appeal Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 29 March 2017.
Where is Townsend Farm?
3.7 km north-west of Cheddar, Somerset, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).