Solar · United Kingdom
Torbay Hospital, Nightingale Park - Solar Panel Array
Operator TDA
Awaiting Construction3.2 MWData checked 16 November 2026Source record dated 4 March 2025
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Torbay Hospital, Nightingale Park - Solar Panel Array is a 3.2 MW solar farm on the edge of Cockington, Devon, United Kingdom. Its planning application (P/2021/1287) went to Torbay on 26 November 2021 and was granted on 16 June 2022. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 15 other energy sites within 10 km, 9 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Torbay Hospital, Nightingale Park - Solar Panel Array changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Torbay Hospital, Nightingale Park - Solar Panel Array sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1523, Fire damages solar panel batteries in a Teignmouth garage, 8.3 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1523 | 2026 | Fire damages solar panel batteries in a Teignmouth garage | 8.3 km | Minor |
| EIR-1535 | 2022 | Fire involves roof and solar panels at a house under construction in Dittisham | 13 km | Minor |
| EIR-1536 | 2020 | Inverter fire at a solar farm at East Langford, Kilkhampton | 16 km | Minor |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 3.2 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- TDA
- Location
- Nightingale Park Barton Hill Way Torquay, Devon, TQ2 8JG, United Kingdom
- Planning authority
- Torbay
- Planning application
- P/2021/1287
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for P/2021/1287, with what the planning evidence pack adds for this site.
Every application in Torbay · Alerts for applications and incidents near here
Timeline
- 26 November 2021 Planning application submitted
- 16 June 2022 Planning permission granted
- 16 June 2025 Planning permission expired
Incidents on the register at this site
None found. The register holds no published incident that names Torbay Hospital, Nightingale Park - Solar Panel Array. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Torbay Hospital, Nightingale Park - Solar Panel Array had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Torbay Hospital, Nightingale Park - Solar Panel Array; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Torbay Hospital, Nightingale Park - Solar Panel Array?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 4 March 2025.
- Where is Torbay Hospital, Nightingale Park - Solar Panel Array?
- On the edge of Cockington, Devon, United Kingdom (postcode TQ2 8JG).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).