Battery storage · United Kingdom
Torquay (Barton Hill Industrial Park - Battery Energy Storage Facility)
Operator Power Initiatives Limited · Owner Conrad (Torquay) Limited
Operational22.5 MWData checked 16 November 2026Source record dated 5 June 2026
Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.
Torquay (Barton Hill Industrial Park - Battery Energy Storage Facility) is a 22.5 MW battery storage site on the edge of Cockington, Devon, United Kingdom. Its planning application (P/2021/0345) went to Torbay on 5 May 2021 and was granted on 5 July 2021. It has been operating since 21 December 2023. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 14 other energy sites within 10 km, 5 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.
Get an email when Torquay (Barton Hill Industrial Park - Battery Energy Storage Facility) changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, battery storage incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every battery storage incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
What this site did, from settlement data
Full revenue and market view The pounds behind each bar, any period back to 2021, where it ranks against every site like it, who trades it, and a side-by-side with any other site.
Contains BMRS data © Elexon Limited copyright and database right (datasets B1610 and MID, the interim settlement run). Read each morning; a settled figure can be revised in later runs.
The company behind this site
POWER INITIATIVES LIMITED (10055149), active, since 2016. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
The site
- Technology
- Battery storage (Stand-alone Storage)
- Capacity
- 22.5 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Power Initiatives Limited
- Owner
- Conrad (Torquay) Limited
- Location
- Barton Hill Industrial Park, Barton Hill Way, Torquay, Devon, TQ2 8JJ, United Kingdom
- Planning authority
- Torbay
- Planning application
- P/2021/0345
- First operating
- 2023
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for P/2021/0345, with what the planning evidence pack adds for this site.
Every application in Torbay · Alerts for applications and incidents near here
Timeline
- 5 May 2021 Planning application submitted
- 5 July 2021 Planning permission granted
- 25 July 2022 Construction started
- 21 December 2023 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Torquay (Barton Hill Industrial Park - Battery Energy Storage Facility). If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Torquay (Barton Hill Industrial Park - Battery Energy Storage Facility) had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Torquay (Barton Hill Industrial Park - Battery Energy Storage Facility); it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Torquay (Barton Hill Industrial Park - Battery Energy Storage Facility)?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 5 June 2026.
- Where is Torquay (Barton Hill Industrial Park - Battery Energy Storage Facility)?
- On the edge of Cockington, Devon, United Kingdom (postcode TQ2 8JJ).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).