Around this site

← Back to Tianjin

Solar · China

Tianjin Binhai Banqiao Farm (Guodian) solar farm

Operational48.9 MWChecked 8 October 2026Last changed in the dataset 18 December 2024

Technology
Solar
Capacity
48.9 MW
Status
Operational (Operating)
Operator
Tianjin Guodian Power New Energy Development
Owner
GD POWER Development Co Ltd [100%]
Location
Banqiao Farm, Tianjin, China

View on OpenStreetMap (the tracker marks the position as approximate). The larger dot is this site; the others are sites within 40 km.

None found. The register holds no published incident that names Tianjin Binhai Banqiao Farm (Guodian) solar farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts.