Solar · United Kingdom

Thompson House Equestrian farm

Operator Emotion Solar One

Operational5 MWData checked 16 November 2026Source record dated 28 November 2016

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Thompson House Equestrian farm is a 5 MW solar farm on the edge of Shevington, Greater Manchester, United Kingdom. Its planning application (A/14/79904/MAJOR) went to Wigan on 13 October 2014 and was granted on 6 February 2015. It has been operating since 31 March 2016. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 51 other energy sites within 10 km, 20 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

770 energy sites within 40 km for Thompson House Equestrian farm

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Emotion Solar One
Location
Thompson House Equestrain Centre, Pepper Lane, Standish, Greater Manchester, WN6 0PP, United Kingdom
Planning authority
Wigan
Planning application
A/14/79904/MAJOR
First operating
2016

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for A/14/79904/MAJOR, with what the planning evidence pack adds for this site.

Every application in Wigan · Alerts for applications and incidents near here

  • 13 October 2014 Planning application submitted
  • 6 February 2015 Planning permission granted
  • 5 January 2016 Construction started
  • 31 March 2016 Operational

None found. The register holds no published incident that names Thompson House Equestrian farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Thompson House Equestrian farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Thompson House Equestrian farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Thompson House Equestrian farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 28 November 2016.
Where is Thompson House Equestrian farm?
On the edge of Shevington, Greater Manchester, United Kingdom (postcode WN6 0PP).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).