← Back to Essex

Solar · United Kingdom

Tesco Extra Hazelmere

Operator Push Energy · Owner Push Renewco Limited

Operational0.4 MWData checked 16 November 2026Source record dated 4 October 2019

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Tesco Extra Hazelmere is a 0.4 MW solar farm in Pitsea, Essex, United Kingdom. Its planning application (18/01749/PVPA) went to Basildon on 7 January 2019 and was granted on 22 March 2019. It has been operating since 4 October 2019. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 66 other energy sites within 10 km, 23 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 34 other sites and 554 energy sites within 40 km for Tesco Extra Hazelmere

Members see the sites and incidents around this one, and every record behind them.

PUSH ENERGY LIMITED (11963582), active, since 2019. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
0.4 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Push Energy
Owner
Push Renewco Limited
Location
Pitsea, Basildon, Essex, Essex, SS13 3JU, United Kingdom
Planning authority
Basildon
Planning application
18/01749/PVPA
First operating
2019

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 18/01749/PVPA, with what the planning evidence pack adds for this site.

Every application in Basildon · Alerts for applications and incidents near here

  • 7 January 2019 Planning application submitted
  • 22 March 2019 Planning permission granted
  • 27 August 2019 Construction started
  • 4 October 2019 Operational

None found. The register holds no published incident that names Tesco Extra Hazelmere. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Tesco Extra Hazelmere had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Tesco Extra Hazelmere; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Tesco Extra Hazelmere?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 4 October 2019.
Where is Tesco Extra Hazelmere?
In Pitsea, Essex, United Kingdom (postcode SS13 3JU).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).